EFTA00802723Set 9
114p30,682w
ENVIRONMENTAL ASSESSMENT
FOR THE CONSTRUCTION OF TWO DOCKS AND A BARGE
LANDING
ON GREAT ST. JAMES ISLAND
U.S. VIRGIN ISLANDS
PREPARED FOR
GREAT ST. JIM, LLC.
PREPARED BY
BIOIMPACT ... located at 18° 18.902' N and 64° 49.802'W, the western
Christmas Cove Dock is located at 18° 18.804' N and 64° 49.876' W, and the southern
barge landing/dock ... entire island of Great St. James is within CZM first
tier jurisdiction. The dock locations on the island are indicated.
EFTA00802726
•
Rot. Hoe*
Steven C-.7
way NS. .fto
Redhook
https://www.justice.gov/epstein/files/DataSet%209/EFTA00802723.pdf
EFTA01119824Set 9
2006-11-1536p15,610w
condominium
office building, separate gate houses, a restaurant and outdoor eating area, a fuel dock building and a
maintenance shed.
Marina Engineering Summary
Overall, the property is in fair condition ... utilities. The following highlights
the findings of this effort.
> Site Exposure - The marina docks and amenities are generally well-protected from prevailing
environmental forces. Simpson Bay is sheltered from ... slight changes in the recorded mean low water depths, notably
some shallovving in A Dock and NB fairway areas. Docks B and C appear more stable.
Marina management reports
https://www.justice.gov/epstein/files/DataSet%209/EFTA01119824.pdf
EFTA01309340Set 10
2019-06-0970p17,220w
hell gsj? .
• pebble beach seocnnd floor,
• grotto. .
• gym. floors. layout.
• Internet. etc.
• gsj dock house. ce,
• jet ski docks. .
• trees.?
See page 2
6/9/2019 8:30am White Table Notes
CONFIDENTIAL ... heli gsj? .
pebble beach seocnnd floor,
grotto. .
gym. floors. layout. .
internet. etc.
gsj dock house.
jet ski docks. .
trees.?
<-1
lot)
CONFIDENTIAL
SONv_GM_003326.43
EFTA_00205369
EFTA01309343
EFTA ... loaded,
LSJ Tiki Hut Michael & Contractors Freezer awaiting pickup for transport to LSJ.
38 Dock GSJ Amy Dempsey Under CZM review for permitting: 1. Temporary Barge ramp (GSJ
Permits North
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01309340.pdf
EFTA01113423Set 9
2015-10-018p3,793w
SPREADSHEET
10/1/2015
SEAWALL ESTIMATES
Scope of work: Remove existing floating seawall footer sheets, remove dock, construct new seawall in front of exIsdng seawall with new 8 ft wide dock, Install ... oonaete piles, Install
new travertine on new boat dock.
ENGINEERING
DOCK ASSOC. CONSY.
SEAWALL COMPANY SEAWALL PRICE BOAT LIFT AND PERMIT FEE PERMIT SUBTOTAL LC E DITENSION
TRAVERTINE WORK DURATION ... permit review comment requirements.
PROPOSAL/CONTRACT REPAIRS OF ALL KINDS.
B&M Marine Construction, Inc. DOCKS & SEAWALLS
CGC052820 WOOD & CONCRETE
STATE LICENSED & INSURED MARINE CONTRACTORS HELICAL. PILES
6276 MADRAS CIRCLE
https://www.justice.gov/epstein/files/DataSet%209/EFTA01113423.pdf
EFTA00793341Set 9
4p1,574w
DESCRIPTION OF PROJECT OR ACTIVITY
12. PROJECT NAME OR TITLE (see instructions)
Access Dock, Dock/Barge Ramp and Temporary Barge Ramp
13. NAME OF WATERBODY, IF KNOWN (if applicable) 14. PROJECT ... look, St. Thomas proceed south in Pillsbury Sound to Great St. James, the dock is located in the northeast bay.
ta. Nature of Activity (Description of project, include all features ... Great St. Jim, LLC is seeking to construct two docks. one of which is a combination dock/ barge landing, and a temporary barge landing to
provide access to Great
https://www.justice.gov/epstein/files/DataSet%209/EFTA00793341.pdf
EFTA02347794Set 11
2016-01-043p447w
Sent: Monday, January 4, 2016 1:23 PM
To: Jeffrey Epstein
Subject: FW: P Dock
On 1/4/16, 8:22 AM, "Revier, Michael" < > wrote:
>Good Morning Mr. Kahn,
>We have brought ... issue of LSJ barge relocation to the P-dock owner.
>Unfortunately, the owner has reaffirmed his determination that, given
>the environmental conditions in Vessup bay, the structural design ... dock is not of appropriate type and strength to safely moor the LSJ
>barge without damage to dock or vessel.
>AYH is happy to make the D-dock tee head
https://www.justice.gov/epstein/files/DataSet%2011/EFTA02347794.pdf
EFTA00299891Set 9
2010-04-1510p1,782w
FINANCIAL LLC
-Articles of Organization
-Certificate of Existence
Operating Agreement
DRAWER TWO:
LSJ CZM Dock Permits
-CZM Dock Permit & Modification (Floating Dock) CZM CZT-3-05(W) Modification ... Permit
-Dock Shelter Permits, April 4, 2011
-Signed CZM Permit tiCZT-5-99(W) Modified, Oct. 3, 2011; Letter Jan. 11, 2012 RE:
Addition of Major Coastal Zone Permit ... Underwater lights ( CZM CZT-5 99W Emergency Light Approval for Dock 9-27-06)
(Not in Redweld as of dec 30, 2010)
9. Utililities Plan by Maguire Group (Includes electrical
https://www.justice.gov/epstein/files/DataSet%209/EFTA00299891.pdf
EFTA01309540Set 10
24p4,236w
Loaf vett Close fa
aloe r- t &du/ex
Pod AcispeenoNS con•atcl-eci of dock- 'cod bcdtcker /81
a It appears fo be Order ... ci.ler5 kto-al a tee,
too lifts 1ns peanori cc:rot -ca.. fcci Dock and beac-h, arts,
/4 11 at pears 17, be in ordea ... kspecnau conducted beet al and dock Ores
-to /vol.& ben.) liner or hoof oii4 1174
tso ois , gvei Arn7_ at i oe. rcr /o tie In or -elate
!336 Firs
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01309540.pdf
EFTA01733182Set 10
2015-12-172p287w
Sent: Thursday, December 17, 2015 9:57 PM
To: Jeffrey E.
Subject: Fwd: P Dock
sounds like a bull shit response
please =dvise
thank you
Richard Kahn
HBRK Associates ... cell =
Begin forwarded message:
From: =/b>"Revier, Michael" <
Subject: =/b>RE: P Dock
Date: =/b>December 17, 2015 at 4:55:13 PM =ST
To: =/b>Richard Kahn <
Cc: "Jones ... perations Kenny Jones, and researching documents and
correspondence =egarding P-dock:
It is our understanding =hat the owners of P-dock (AYH only manages the dock) do not wish
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01733182.pdf
EFTA01102143Set 9
3p1,306w
LOCATION, AND DESCRIPTION OF PROJECT OR ACTIVITY
t2. PROJECT NAME OR TITLE (see instructions)
Dock Maintenance existing Dock GSJ, Placement of RO intake line under dock
13. NAME OF WATERBODY ... Hook, St. Thomas proceed south in Pillsbury Sound to Great St. James, the dock is located in the northeast bay.
18. Nature of Activity (Description of project, include all features ... Great St. Jim, LLC would like to conduct dock maintenance on the existing dock. They would like to replace the decking which has
become splintered and replace the cleats
https://www.justice.gov/epstein/files/DataSet%209/EFTA01102143.pdf
EFTA00687453Set 9
2011-11-082p141w
Photographs - November 8, 2011
Date: Tue, 08 Nov 2011 20:50:42 +0000
Attachments: Dock_housejpg; Dock_house_(2).jpg; Dock_house_(3).jpg; Dock_house_(4).jpg;
Dock_house ... Dock_house_(6).jpg; Dock_house_(7)jpg; Dock_house_(8).jpg;
Dock_house_(9)jpg; Dock_house_(10).jpg; Dock_house_(11).jpg; Dock_house_(12).jpg;
Dock_house ... area_(5).jpg
Greetings Mr. Epstein,
November 8 photographs for your review and comments:
Dock house
Main compound
Courtyard tree lights
Library path
EFTA00687453
Palms
Archer platform light
Big hill
https://www.justice.gov/epstein/files/DataSet%209/EFTA00687453.pdf
EFTA00737482Set 9
2010-07-303p480w
From: "Emad Hanna"
To: "Jeevacation" <jeevacation®gmail.com>
Subject: Jet Ski docks
Date: Fri, 30 Jul 2010 20:25:12 +0000
Attachments: 07-30-10-Jet-Ski-Dock.pdf
Jeffrey,
Due to the information received below ... back to the attached floating docks. Please review the attached and let me
know what color you want ordered.
The cost delivered to Tropical for two units ... Emad Hanna
Cc: ; Casey Johnson; Carlos Rod; Gary Kerney
Subject: Re: Jet Ski docks
Emad:
Have spoken to Carlos about his approach, which was to add 2 beams across
https://www.justice.gov/epstein/files/DataSet%209/EFTA00737482.pdf