EFTA01119824Set 9
2006-11-1536p15,610w
condominium
office building, separate gate houses, a restaurant and outdoor eating area, a fuel dock building and a
maintenance shed.
Marina Engineering Summary
Overall, the property is in fair condition ... utilities. The following highlights
the findings of this effort.
> Site Exposure - The marina docks and amenities are generally well-protected from prevailing
environmental forces. Simpson Bay is sheltered from ... slight changes in the recorded mean low water depths, notably
some shallovving in A Dock and NB fairway areas. Docks B and C appear more stable.
Marina management reports
https://www.justice.gov/epstein/files/DataSet%209/EFTA01119824.pdf
EFTA01113916Set 9
2014-01-1114p3,003w
submerged lands extending out approximately 80 feet from the eastern
side of A Dock.
6100 Red Hook Quarters #2, St Thomas, USVI 00802
Phone Fax
EFTA01113916
Wage
2. STFSC ... plan drawn by Applied Technology & Management (ATM) attached
hereto as Exhibit B (the "ATM Dock Relation Plan"). As indicated in the STFSC 1993
Permit and as shownon the ATM Dock ... Relation Plan, STFSC's submerged lands on the
western side of the STFSC Dock ("P Dock") extend out only 10 feet from the edge of P
Dock. The pilings located
https://www.justice.gov/epstein/files/DataSet%209/EFTA01113916.pdf
EFTA00590590Set 9
2014-01-1114p3,012w
submerged lands extending out approximately 80 feet from the eastern
side of A Dock.
6100 Red Hook Quarters #2, St Thomas, USVI 00802
Phone Fax
EFTA00590590
Wage
2. STFSC ... plan drawn by Applied Technology & Management (ATM) attached
hereto as Exhibit B (the "ATM Dock Relation Plan"). As indicated in the STFSC 1993
Permit and as shownon the ATM Dock ... Relation Plan, STFSC's submerged lands on the
western side of the STFSC Dock ("P Dock") extend out only 10 feet from the edge of P
Dock. The pilings located
https://www.justice.gov/epstein/files/DataSet%209/EFTA00590590.pdf
EFTA02477846Set 11
2016-01-043p419w
Sent: Monday, January 4, 2016 1:23 PM
To: Jeffrey Epstein
Subject: FW: P Dock
On 1/4/16, 8:22 AM, "Revier, Michael" •r • wrote:
>Good Morning Mr. Kahn,
>We have ... brought the issue of LSJ barge relocation to the P-dock owner.
>Unfortunately, the owner has reaffirmed his determination that, given
>the environmental conditions in Vessup bay, the structural design ... dock is not of appropriate type and strength to safely moor the LSJ
>barge without damage to dock or vessel.
>AYH is happy to make the D-dock tee head
https://www.justice.gov/epstein/files/DataSet%2011/EFTA02477846.pdf
EFTA00637640Set 9
2016-01-043p428w
From: Richard Kahn
To: Jeffrey Epstein <jeevacation@gmail.com>
Subject: FW: P Dock
Date: Mon, 04 Jan 2016 13:23:25 +0000
On 1/4/16, 8:22 AM, "Revier, Michael" wrote:
>Good Morning ... Kahn,
>We have brought the issue of LSJ barge relocation to the P-dock owner.
>Unfortunately, the owner has reaffirmed his determination that, given the
>environmental conditions in Vessup ... structural design of P-dock
>is not of appropriate type and strength to safely moor the LSJ barge
>without damage to dock or vessel.
>AYH is happy to make
https://www.justice.gov/epstein/files/DataSet%209/EFTA00637640.pdf
EFTA01090507Set 9
2016-04-052p522w
Franklin Delano Roosevelt Ave. #383
San Juan, PR 00918
Re: Maintenance of an Existing Dock on Great St. James and Placement of a Reverse
Osmosis Intake Line Under the Dock ... Great St. James, and would like •
to conduct maintenance activities on the existing dock. They would also like to place a
reverse osmosis (RO) intake line beneath the dock which ... would hand down from the
dock and then extend into water at the terminus of the dock. We have the original CZM
permit for the dock, and the joint application
https://www.justice.gov/epstein/files/DataSet%209/EFTA01090507.pdf
EFTA00821057Set 9
2016-08-174p906w
Jeffrey Epstein leevacation@gmail.corn>
Cc: Rich Kahn < >, ann rodriquez
Greetings Sir,
Preliminary Dock drawings from Jeff Bateman for your review and comments.
Respectfully, Daphne
Forwarded message
From: <1
Date ... gets closer to fruition. Sheet 4 is for the plan and
profile of each dock, what is shown is not for this project - NOAA has not verified the water levels ... like your feedback on.
thanks and have a great day !!!
For barge docks (100x15Ft)
- Barge specifications.
- Capacity (how many barges to be docked at the same time).
- Docking purpose.
- Facilities
https://www.justice.gov/epstein/files/DataSet%209/EFTA00821057.pdf
EFTA01220982Set 9
2019-05-245p1,471w
Intake-Mike, where are we with this?
45 GSJ New Dock Water Sport Ramp-
(area has been cleared out and ready for decisions. Bella sent wire 2 days ... portable dock
ramps.)
47 Maurice Brother ? Mike, where are we with this? Is he coming to do some work?
94,95,96 LSJ Cistern 1,2,3 Cistern Pumps ... install yet...on HOLD
35 LSJ Tiki Hut Freezer-? Did Daphne order
37 Dock (LS1 or GSJ) ? Permits-Mike?
38 Christmas Cove Moorings Moorings-part of permits...Cecile
https://www.justice.gov/epstein/files/DataSet%209/EFTA01220982.pdf
EFTA00821062Set 9
2016-08-174p929w
Jeffrey Epstein <jeevacation@gmail.com>
Cc: Rich Kahn < >, ann rodriquez
EFTA00821062
Greetings Sir,
Preliminary Dock drawings from Jeff Bateman for your review and comments.
Respectfully, Daphne
------- Forwarded messa e
From:
Date ... gets closer to fruition. Sheet 4 is for the plan and
profile of each dock, what is shown is not for this project - NOAA has not verified the water levels ... like your feedback
on. thanks and have a great day !!!
For barge docks (100x15Ft)
- Barge specifications.
- Capacity (how many barges to be docked at the same time).
- Docking purpose.
EFTA00821064
https://www.justice.gov/epstein/files/DataSet%209/EFTA00821062.pdf
EFTA00606068Set 9
2017-05-0812p8,894w
binding site predictions on tubulin, the protein subunit of
microtubules, with molecular docking simulations, quantum chemistry calculations, and theoretical
modeling of collective dipole interactions in tubulin to investigate the effect ... action we use results of previous anesthetic binding site predictions on tubulin with molecular dock-
ing, quantum chemistry calculations, and theoretical modeling of collective London dispersion interactions to
investigate ... harmful side effects. Below,
we discuss the results obtained in our study.
Results
Anesthetic Docking to Tubulin. To computationally predict the effect of anesthetics on the tubulin protein
https://www.justice.gov/epstein/files/DataSet%209/EFTA00606068.pdf
EFTA00299879Set 9
2010-04-1512p2,279w
Peter Capone Designs
27. Sanford Amerling and Associates
28. Meridian AIA Document for New Dock Construction 2002
29. Legal Invoices
30. Michael J. Glidden Electric, Inc.
31.
Delongh Group Architects ... April 9, 2008
7. Underwater lights ( CZM CZT-5 99W Emergency Light Approval for Dock 9-27-
06) (Not in Redweld as of dec 30, 2010)
8. Utililities Plan ... Redweld
as of dec 30, 2010)
12. NOVA February 2008 ( Dock Permit)
13. CZM Dock Permit & Modification (Floating Dock) CZM CZT-3-05(W) Modification
https://www.justice.gov/epstein/files/DataSet%209/EFTA00299879.pdf