EFTA01119824Set 9
2006-11-1536p15,610w
significant tropical storms. According to the marina operators, the basin has only been
dredged twice in the past 8 years. Records received from the owners were limited; however,
they indicated ... dredging of -6,000 cy in 2003 to deepen the entrance approach behind Snoopy
Island and 31,000 cy in 1999. Over the effective plan area of the marina ... appear more stable.
Marina management reports the need for some maintenance dredging in 2006. ATM's survey
check indicated some areas of 7.5-10 ft under A Dock, with depths
https://www.justice.gov/epstein/files/DataSet%209/EFTA01119824.pdf
MANAGEMENT
IN NORTH CAROLINA
NC DIVISION OF MARINE FISHERIES
March 2014
EFTA00788580
6,000
Dredging began
Oyster Harvest Trends
5,000 Dredging area 3- inch size Shellfish license
greatly reduced ... Lease
Oyster Rehabilitation
sail only allowed rock oysters 4 production
4 4 documentation «•quileil
■ Dredge weight limit 100 lbs
4,000
Dredge area
w (no poor limit) 4
expanded ... power S bushel hand; 15
limit on coon
V boats dropped oyjers bushel dredge
2.5 inch size
5 harvest limits
limit on rock 4Daily limit of 75 bushels
https://www.justice.gov/epstein/files/DataSet%209/EFTA00788580.pdf
EFTA01113423Set 9
2015-10-018p3,793w
pile driving, pile log and monitoring, sismIc testing, orck punching, warranty of
existing seawall, dredging, seagrass survey, weekend or overtime work, any unforseen or additional engineering fees or Building Dept ... actual units installed.
I I. If punching of rack is mammy to excavate or dredge there will be an additional charge of $50000 per hour for punching time
12. Stamby ... additional.
IS. B&M Marine Construction. Inc is not responsible for dredging which may be required for use of boot lift
16. B&M Marine Construction. Inc. is not responsible
https://www.justice.gov/epstein/files/DataSet%209/EFTA01113423.pdf
EFTA00603754Set 9
11p5,940w
Related Facilities (such Related Facilities tc
include but not be limited to breakwaters, groins, dredging, filling and excavating,
I landscaping, roadways, building and docks, restaurant, guest facilities, together
with ... have no
obligation with respect to costs of development and construction, including coats
of dredging, excavating, filling, and other such associated work. Hans Lollik
further agrees and covenants that ... terious action with
agreed and understood, however
shall have the right to dredge an , that Hans LaIlik
access channel, of adequate
one hundred (100) feet wide at the depth
https://www.justice.gov/epstein/files/DataSet%209/EFTA00603754.pdf
EFTA01203353Set 9
2015-07-173p1,194w
slips to meet future market demand (assuming a broader market recovery), but also
requires dredging and shoreline stabilization to make better use of inner slips. The overall concept reduced
available ... current
layout, and was estimated to cost between $4MM and $5.5MM assuming dredging and permitting hurdles
could be overcome.
In 2015, ATM will be submitting on American Yacht Harbor
https://www.justice.gov/epstein/files/DataSet%209/EFTA01203353.pdf
EFTA01113608Set 9
2012-03-089p3,035w
structure on land, in or under the water; discharge or disposal of any dredged
material or of any liquid or solid waste; grading, removing, dredging, mining, or
extraction
https://www.justice.gov/epstein/files/DataSet%209/EFTA01113608.pdf
EFTA00603188Set 9
2012-03-089p3,032w
structure on land, in or under the water; discharge or disposal of any dredged
material or of any liquid or solid waste; grading, removing, dredging, mining, or
extraction
https://www.justice.gov/epstein/files/DataSet%209/EFTA00603188.pdf