EFTA01125772Set 9
2012-08-1027p6,733w
Barbados and is in the business of offering and providing engineering, procurement and
construction ("EPC") services to power plant companies in Venezuela and other countries in
South America. Those services ... Betancourt left BGB/GESCA to launch his own
company for purposes of engaging in the EPC services business serving the Venezuelan and
foreign energy markets.
25. Betancourt subsequently recruited plaintiff Trebbau ... operations of all projects, and is directly responsible for the
execution of large EPC contracts in Venezuela. Trebbau is also responsible for establishing
strategic alliances with international engineering, procurement
https://www.justice.gov/epstein/files/DataSet%209/EFTA01125772.pdf
EFTA01435716Set 10
2018-04-207p1,147w
additional LNG terminal under construction
and another under consideration.
Lump-sum, fixed-price, turnkey EPC Contracts for the construction
with Bechtel, a premier engineering, construction and project management
companies ... EPC Contracts include liquidated-damage provisions requiring
performing within 95% of design specifications and 18-month defect liability
provisions and are guaranteed by Bechtel Global (entity that includes
Bechtel ... Project's
construction is currently 35% complete.
Fixed price, lump sum, date-certain EPC Contract with delay
Liquidated Damages.
Backstopped by parent guaranty from IHI (Japanese Corp Rating
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01435716.pdf
EFTA01434814Set 10
2018-04-208p1,304w
additional LNG terminal under construction
and another under consideration.
Lump-sum, fixed-price, turnkey EPC Contracts for the construction
with Bechtel, a premier engineering, construction and project management
companies ... EPC Contracts include liquidated-damage provisions requiring
performing within 95% of design specifications and 18-month defect liability
provisions and are guaranteed by Bechtel Global (entity that includes
Bechtel ... Project's
construction is currently 35% complete.
Fixed price, lump sum, date-certain EPC Contract with delay
Liquidated Damages.
Backstopped by parent guaranty from IHI (Japanese Corp Rating
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01434814.pdf
EFTA01433961Set 10
2018-04-197p1,085w
additional LNG terminal under construction
and another under consideration.
Lump-sum, fixed-price, turnkey EPC Contracts for the construction
with Bechtel, a premier engineering, construction and project management
companies ... EPC Contracts include liquidated-damage provisions requiring
performing within 95% of design specifications and 18-month defect liability
provisions and are guaranteed by Bechtel Global (entity that includes
Bechtel ... Project's
construction is currently 35% complete.
Fixed price, lump sum, date-certain EPC Contract with delay
Liquidated Damages.
Backstopped by parent guaranty from IHI (Japanese Corp Rating
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01433961.pdf
EFTA01109967Set 9
2013-02-2219p5,498w
Innovation ->> Renewable Energy Proposal
Solar Project #3: Italy (San Rocco)
Scope: 3.2 MW — Full EPC Contract
Contract Value: 10,530,000 €
Contract Award: October 2010
Contract NTP: December 2010
Completion ... Inverters (Toshiba), SCADA (Prisma
Impianti)
Solar Project #4: Italy (Alessandria)
Scope: 7.3 MW — Full EPC Contract
Contract Value: 27,000,000 €
Contract Award: September 2009
Contract NTP: November 2009
Completion ... Upsolar), Inverters (Siemens), SCADA
(Siemens)
Solar Project #5: Italy (Carpi)
Scope: 2.2 MW — Full EPC Contract
Contract Value: 7,500,000 €
Contract Award: November 2010
Contract NTP: March 2010
Completion
https://www.justice.gov/epstein/files/DataSet%209/EFTA01109967.pdf
EFTA01158281Set 9
2010-11-1024p10,022w
units or in packages to O&G producers and engineering procurement
and construction firms ("EPC"), with process warranties.
Global Business Model: ProSep is a solutions provider supplying high efficiency process ... industry and invitations to tender on
larger projects. Since oil and gas producers contract EPCs for the design and construction of these new
projects, there is a significant time delay ... EFTA01158286
agreements. During the first half of the year, ProSep's bidding activity with EPCs reached record levels. This
has resulted in increased backlog levels during the second half
https://www.justice.gov/epstein/files/DataSet%209/EFTA01158281.pdf
EFTA01109946Set 9
2013-02-0121p5,806w
Photovoltaic & Energy Storage Proposal
Solar Project #3: Italy (San Rocco)
Scope: 3.2 MW — Full EPC Contract
Contract Value: 10,530,000 €
Contract Award: October 2010
Contract NTP: December 2010
Completion ... Inverters (Toshiba), SCADA (Prisma
Implant')
Solar Project #4: Italy (Alessandria)
Scope: 7.3 MW — Full EPC Contract
Contract Value: 27,000,000 €
Contract Award: September 2009
Contract NTP: November 2009
Completion ... Upsolar), Inverters (Siemens), SCADA
(Siemens)
Solar Project #5: Italy (Carpi)
Scope: 2.2 MW — Full EPC Contract
Contract Value: 7,500,000 €
Contract Award: November 2010
Contract NTP: March 2010
Completion
https://www.justice.gov/epstein/files/DataSet%209/EFTA01109946.pdf
EFTA01367288Set 10
2014-12-311p331w
Subsequent events
Dung 2014. Ofosi sgrec a I witty anstructon contract (EPC) wen Garnesa Wind US LLC (Games) lot ire construction a a wart-power park Due to delays ... Orosl to nvoce USS8,600.000 for 'delay liqudaled carers' per article 8 of the
EPC. while at the same tme agreeng to pay Gameta US$2,000,000 asscceted with ... final liquidated damages could reach up to approximately USS9.707.000. equwalent to 10% ci the EPC value. which is sutred to change
due to potential change orders. It is now estimated
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01367288.pdf
EFTA01386802Set 10
2018-04-191p350w
operational pipeline, 4 • Lump-sum, fixed-price,
operational LNG terminals, and 1 re- turnkey EPC Contracts for the
gasification/storage terminal. 1 construction with Bechtel, a premier
additional LNG terminal under ... engineering, construction and project
construction and another under management companies
consideration. • The EPC Contracts include
liquidated-damage provisions
requiring performing within 95% of
design specifications and 18-month
defect liability ... expansion of an • Fixed price, lump sum, date-
existing facility — infrastructure certain EPC Contract with delay
CONFIDENTIAL - PURSUANT TO FED. R. CRIM. P. 6(e) DB-SDNY-0088664
CONFIDENTIAL SDNY
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01386802.pdf
EFTA01446930Set 10
2014-03-021p574w
higher-end edge and core
routers), virtualized appliances (for radio access network SW, EPC, firewalls, etc), and
Cloud based services - versus an all virtual network of layer 2/7 feature-functions ... WiFi
HW and SW solutions - with potential for pull-through for the ASR 5k EPC platform, the
ASR 9k edge router, etc.
In summary, while the company is making some ... routing portfolio.
We also see the need for Cisco to launch a competitive virtual EPC solution and NFV
focused virtual overlay and Mobile Cloud service orchestration solutions (competitive
with Juniper
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01446930.pdf
EFTA01446964Set 10
2014-03-021p574w
higher-end edge and core
routers), virtualized appliances (for radio access network SW, EPC, firewalls, etc), and
Cloud based services - versus an all virtual network of layer 2/7 feature-functions ... WiFi
HW and SW solutions - with potential for pull-through for the ASR 5k EPC platform, the
ASR 9k edge router, etc.
In summary, while the company is making some ... routing portfolio.
We also see the need for Cisco to launch a competitive virtual EPC solution and NFV
focused virtual overlay and Mobile Cloud service orchestration solutions (competitive
with Juniper
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01446964.pdf
EFTA01452986Set 10
2014-03-021p574w
higher-end edge and core
routers), virtualized appliances (for radio access network SW, EPC, firewalls, etc), and
Cloud based services - versus an all virtual network of layer 2/7 feature-functions ... WiFi
HW and SW solutions - with potential for pull-through for the ASR 5k EPC platform, the
ASR 9k edge router, etc.
In summary, while the company is making some ... routing portfolio.
We also see the need for Cisco to launch a competitive virtual EPC solution and NFV
focused virtual overlay and Mobile Cloud service orchestration solutions (competitive
with Juniper
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01452986.pdf
EFTA01366933Set 10
2015-03-311p516w
November 22, 2013 the Company signed a turnkey Engreenhg. Procurement and Construction agreement ('EPC) with GamesaWnd US LLC ('Gamesa") by
witch Gamesa, as he main abcontracta. committed to Cesar. engineer ... mandacture, procure. install. Nat-up. construct and test the wind farm The total EPC
pnce is 15597,220.640, rcluding subsequent charge orders for a net amoint of UEO51.500.0O3 The EPC
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01366933.pdf
EFTA01367263Set 10
2014-12-311p529w
November 2Z 2013 the Company Spited a turnkey Engheenrig, Procurement and Constructon agreement ('EPC ) veh Gamesa Wind US LLO (Gamine') by which
Gamete, as the main sub-ccotractor, committed ... demon eogneer, manufacture procure install, startup, construct and test the wind farm The total EPC price is
US597,220640, including subsequent change orders for a net amount c4USDS1 ... EPC contract includes design-defect and performerce warranties in favor
of Orosl *TWO are supported by a standby letter d credit for USS14,358,036
The Company does rot have
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01367263.pdf
EFTA01367116Set 10
2014-12-311p313w
tionstructon of the Runstullo II and Runatullei III Hydroelectric Plants at the EPC
overact commencement dale fat amounted to USS6.970,460 (equivalent toy 17,782 737) As of December ... December 31. 2014 and 2013. balances payable correspond to the thrty valiabon of the EPC contact for 0552264,034 (equivalent to
S/8.787.197) and 1553.573.422 (equivalent to 519.991.828). respectively. It also ... includes tilling' to the valuations of the EPC contract web the con pani
GCZ Ingenstros SAC by the construchon d hydrcelectoc Runatillo II and III by 153833.803 (equvalent