EFTA01109967Set 9
2013-02-2219p5,498w
located on the roofs of the generator and
desalinization plant buildings. The 150 kWAc ground mounted PV system would be located on the
grounds of the existing Kite House ... Fixed Tilt: 5° (roof), 16° (ground)
Azimuth: 10° Generator Bldg, 45° Desalinization Bldg, 0° Ground Mount
Racking Components: Aluminum and/or stainless steel
Although not included in the options presented ... proposal there is a potential to install an
additional 420 kWp (300 kWAC) of ground mounted PV solar in the shaded area below. This larger solar
option would only
https://www.justice.gov/epstein/files/DataSet%209/EFTA01109967.pdf
EFTA01080648Set 9
2012-09-1514p3,267w
ryfpLogic
Proposal for Solar PV
Prepared By: Prepared For:
9/15/12 Jeffrey Epstein, Ground Mount
Brannon Bloom Little Saint James Island
Energy Systems Little Saint James, USVI 00802
Pure Logic Clean ... assuming a 3.00% inflation of the cost of energy averaged over 25 years.
Example ground mount on Crown Mountain, STT
for the Brunt Family
Pure Logic Clean Energy Ouote ... Energy Quote I I Web:
EFTA01080660
Proposal Acceptance and Letter of Intent
Jeffrey Epstein, Ground Mount
Little Saint James Island
Little Saint James, USVI 00802
340-775-2525
Proposal Summary
https://www.justice.gov/epstein/files/DataSet%209/EFTA01080648.pdf
Changes to LSJ Proposal, 10-15-12
1. Ground Mount Array
1. Changed the starting $/kWh from WAPA from $0.45 to $0.56, the price scheduled
to be in place ... credit which brought the payback to —5 years.
5. Changed the Helipad ground mount to new location, chosen by owner, labelled
"Option A" and "Option B". Changed "Layout" image ... Changed name from "Helipad" to "Ground Mount".
2. Cart Barn
1. Removed 30% Tax Credit and 50% Bonus Depreciation
2. Payback is —4.5 years
3. Removed "colored module" option
https://www.justice.gov/epstein/files/DataSet%209/EFTA01092071.pdf
Changes to LSJ Proposal, 10-15-12
1. Ground Mount Array
1. Changed the starting $/kWh from WAPA from $0.45 to $0.56, the price scheduled
to be in place ... credit which brought the payback to —5 years.
5. Changed the Helipad ground mount to new location, chosen by owner, labelled
"Option A" and "Option B". Changed "Layout" image ... Changed name from "Helipad" to "Ground Mount".
2. Cart Barn
1. Removed 30% Tax Credit and 50% Bonus Depreciation
2. Payback is —4.5 years
3. Removed "colored module" option
https://www.justice.gov/epstein/files/DataSet%209/EFTA00618012.pdf