EFTA00281516Set 9
478p163,814w
tons of waste per year. Development alters land from natural,
biologically diverse habitats to hardscape that is impervious and devoid of biodiversity. The far-
reaching influence of the built environment ... take years to remedy.
This credit section addresses environmental concerns relating to building landscape, hardscape,
and exterior building issues and promotes the following measures:
Selecting a Building That Has Developed ... site design. This may include
modification of existing stormwater management systems and replacing site hardscapes with
vegetated areas that decrease site runoff.
6. Calculations
The following calculation illustrates one method
https://www.justice.gov/epstein/files/DataSet%209/EFTA00281516.pdf
EFTA00612204Set 9
4p1,888w
uniqueness of your landscape. For
aesthetic appeal and consistency we keep garden beds and hardscapes clean from accumulated debris, turf areas trimmed, and
mulches raked.
GENERAL GARDEN BEDS, PLANTS, SHRUBS ... trimmings will
be raked and hauled from property or are available for composting. Surrounding hardscapes swept and/or blown. Proper
watering will be monitored. EcoScapes may recommend annual aeration to lawns ... also add this debris to a client's compost if requested.
HARDSCAPES (walkways, stone work, graveled areas): Walkways will be weeded and kept free from debris. Stonework will be
swept
https://www.justice.gov/epstein/files/DataSet%209/EFTA00612204.pdf
EFTA01100723Set 9
4p1,869w
uniqueness of your landscape. For
aesthetic appeal and consistency we keep garden beds and hardscapes clean from accumulated debris, turf areas trimmed, and
mulches raked.
GENERAL GARDEN BEDS PLANTS. SHRUBS ... trimmings will
be raked and hauled from property or are available for composting. Surrounding hardscapes swept and/or blown. Proper
watering will be monitored. EcoScapes may recommend annual aeration to lawns ... also add this debris to a client's compost if requested.
HARDSCAPES (walkways, stone work, graveled areas): Walkways will be weeded and kept free from debris. Stonework will be
swept
https://www.justice.gov/epstein/files/DataSet%209/EFTA01100723.pdf
EFTA00801682Set 9
2015-05-0521p1,614w
Rounded Total $22,411,000
Replacement Cost of Other Structures and Hardscape*
Structure/Hardscape Replacement Cost
Hardscape $500,000.00
Staff Residence and Garage $264,000.00
Pump House and Water Tank ... Managers House $205,000.00
Ranch Assistant Managers Garage $48,000.00
Total: $5,911,500.00
'Hardscape refers to decorative elements of your property that are not physically attached to your main ... arbors — but does not include living plants (landscaping). The replacement cost of some hardscape may have
been estimated separately while the remainder has been grouped under a generic heading
https://www.justice.gov/epstein/files/DataSet%209/EFTA00801682.pdf
EFTA00726582Set 9
2009-06-166p1,846w
site
urban design master planning & design, site landscape planting, site lighting fixture selection and
hardscape design as listed below in the Scope of Services and Clarifications.
Specific Site Areas include ... suitable for design coordination of the project.
These drawings shall include landscape planting plans, hardscape plans and site
furnishing plans and site lighting location plans with appropriate details. The plans ... outdoor use areas indicating parking, arrival plazas,
walkways, water features and landscape features.
2. Hardscape and special pavement areas.
3. Design intent for fountain features.
4. Product catalog cut sheets
https://www.justice.gov/epstein/files/DataSet%209/EFTA00726582.pdf
EFTA01221714Set 9
2011-05-168p1,574w
Cottage Pool Replacement Cost $165,000 $2,500 $16,500
Hardscape throughout Extended Rebuilding Cost $1,500,000 $2,500 $150,000
Salt Pond Cabin Extended Rebuilding Cost ... structures you own that are situated on the grounds of your
residence. This includes hardscape such as driveways, fountains, underground irrigation systems, decorative
pools, terrace-s, patios, retaining walls, walkways
https://www.justice.gov/epstein/files/DataSet%209/EFTA01221714.pdf