EFTA01146657Set 9
2014-09-2528p6,910w
SUMMARY FOR WORK ORDER NUMBER: 23814 Registration Number: N2121E
Time & Materials Flat Rate Total
Labor: 7,578.00 USD 13,805.00 USD 21,38100 USD
Pans ... 09/04/2014 GW
09/10/2014 JR
09/11/2014 JR
09/12/2014 JR GW
Time & Materials Flat Rate Total
Labor: 1,155.00 USD 1,155.00 USD
Total ... Labor
labor Billing "Type Hours Type Hours Rate Amount
Time and Material ST 10.50 110.00 1.155.00 USD
1,155.00 USD
Item: 3. G-IV N2121E Cleaning Part/Model #: G-IV
Item
https://www.justice.gov/epstein/files/DataSet%209/EFTA01146657.pdf
EFTA00609734Set 9
2013-04-0157p13,185w
JEGE, INC.
INVOICE SUMMARY FOR WORK ORDER NUMBER: SC13175
Time & Materials Flat Raw Total
Labor USD: $23,939.84 $74,150.00 $98,089.84
Parts USD: $196,307.51 $0.00 $196,307.51
Services ... PB8R624N
Discrepancy: 1.2 Inbound/Outbound Inspection
Resolution: Complied with Inbound / Outbound Inspections.
Labor USD: No Charge N/ C
Step: 1.2.1 Completed Inbound/Preliminary Inspection
Step: 1.2.2 Waiting Outbound Inspection
approval (L)
Discrepancy ... aircraft.
Discrepancy: 1.6 Cover & Protect
Resolution: Protected aircraft as required for MX as required.
Labor USD: No Charge N/ C
Discrepancy: 1.7 Service Chemical Toilet/('lean Galley
Resolution: N/A
Discrepancy
https://www.justice.gov/epstein/files/DataSet%209/EFTA00609734.pdf
EFTA01117652Set 9
2013-04-1849p14,045w
JEGE, INC.
INVOICE SUMMARY FOR WORK ORDER NUMBER: SC13175
Time & Materials Flat Rate Total
Labor USD: $7,709.71 $76,680.00 $84,389.71
Pails ... Gulfstream
West Palm Beach, FL 33406
FAA CRS PB8R624N
Billing Method Flours Rate Total
Labor USD: Time and Material ST 0.95 @ $115.00 $109.25
Labor USD: Time and Material ... Labor USD: Time and Material DT 0.65 @ $230.00 $149.50
Total USD: $327.95
Discrepancy: 1.2 Inbound/Outbound Inspection
Resolution: Complied with Inbound / Outbound Inspections. Refer to steps below.
Labor USD: No Charge
https://www.justice.gov/epstein/files/DataSet%209/EFTA01117652.pdf
EFTA01094276Set 9
2009-05-14609p146,770w
Warranty
Logbook TAG I MOD HW I SW TSNMO TSOMO TSRMO Manufacturer I Labor
Position MM Ref @rAdiustments (Used Hrs. Cye, Date) Warranty
Ops Number(s) Comments Date Type ... Approx Price Warranty
Logbook TAG I MOD HW I SW TSNMO TSOMO TSRMO Manufacturer Labor
Position MM Ref @=Adjustments (Used Hrs. Cye, Date) Warranty
Ops Number(s) I Comments Date ... Approx Price Warranty
Logbook TAG I MOD EN 1 SW TSNMO TSOMO TSRMO Manufacturer Labor
Position MM Ref @=Adlustments (Used Hrs, Cye, Date) Warranty
Ops Number(s) I Comments Date
https://www.justice.gov/epstein/files/DataSet%209/EFTA01094276.pdf
EFTA00804136Set 9
2019-02-2126p9,911w
performance at Stevens Aerospace and Defense Macon, GA facility only.
Flat Rate Labor $53,200.00
Services $7,054.00
Miscellaneous S250.00
Sub-Total ¶60.504.00 Yes ❑ No ❑
Services:
Description: Quantity Sell Price ... Sell price Amount
Defuel Fee 250.00 250.00
Summary Item: 2 G-IV - Inspections/Due Items
Labor 53,200.00
Services 7,054.00
Miscellaneous 250.00
Total 60,504.00
Item: 3 C-IN Discrepancies ... Actual charges will be calculated at time of invoicing as three percent of
total labor.
Yes ❑ No ❑
Miscellaneous Charges:
Title: Description Sell price Amount
Consumables (3% of Labor
https://www.justice.gov/epstein/files/DataSet%209/EFTA00804136.pdf
EFTA00590796Set 9
2016-03-10123p21,314w
Title: JEGE LLC
INVOICE SUMMARY FOR WORK ORDER NUMBER:
lime & Materials Flat Rate Total
Labor USD: $94565.46 $75,096.37 4169,661.83
Parts USD: $43.031.60 SOO) $43,031.60
Services ... GIMP 324101.
SEE STEPS BELOW FOR FURTHER DETAILS.
Billing Method I lour. Rate Total
Labor USD: Time and Material ST 10.74 @ $132.00 $1,417.68
Labor USD: Time and Material ... INOP IN AUTO MODE WORKS IN MANUAL
MODE
Resolution:
Billing Method Hours Rate Total
Labor USD: Time and Material ST 11.54 @ $132.00 $1,523.28
Misc Charges USD: Time and Material
https://www.justice.gov/epstein/files/DataSet%209/EFTA00590796.pdf
EFTA00073205Set 9
2020-09-0155p15,254w
with him in a pattern of criminal activity related to the sex trafficking, forced labor,
sexual assault, child abuse, and sexual servitude of these young women and children. Epstein ... Epstein's bestowal of financial
and other benefits, including sexual services and forced labor from victims.
43. This illicit association of Epstein, Defendants, and his associates constitute what is
referred ... subjecting
underage girls and young women to unlawful sexual conduct, sex trafficking, and forced labor.
45. The Epstein Enterprise engaged in a pattern of criminal activity in the Virgin
Islands
https://www.justice.gov/epstein/files/DataSet%209/EFTA00073205.pdf
EFTA00074744Set 9
2019-08-15118p27,690w
with him in a pattern of criminal activity related to the sex trafficking, forced labor,
sexual assault, child abuse, and sexual servitude of these young women and children. Epstein ... Epstein's bestowal of financial
and other benefits, including sexual services and forced labor from victims.
40. This illicit association of Epstein, Defendants, and his associates constitutes what
is referred ... subjecting
underage girls and young women to unlawful sexual conduct, sex trafficking, and forced
labor.
EFTA00074779
GVI v. Estate of Jeffrey E. Epstein
GVI's Complaint
Page
https://www.justice.gov/epstein/files/DataSet%209/EFTA00074744.pdf
EFTA01112828Set 9
2015-08-1418p4,416w
JEGE LLC
INVOICE SUMMARY FOR WORK ORDER NUMBER: SC17734
Time & Materials Flat Rate Total
Labor USD: $3,920.49 $2,159.00 $6,079.49
Parts USD: $28,472.25 $362.62 $28,834.87
Services ... operator.
Caryn Haner, Airworthiness Inspector
Gulfstream
West Palm Beach, FL 33406
FAA CRS PB8R624N
Labor USD: No Charge N/ C
Discrepancy: 1.2 Inbound/Outbound Inspection
Resolution: Complied with inbound and outbound ... inspections as required. Refer to steps below.
Labor USD: No Charge N/ C
Step: 1.2.1 Completed Inbound/Preliminary Inspection
Step: 1.2.2 Completed Outbound Inspection
Discrepancy: 1.3 Preflight Inspection
Resolution: N/A
Discrepancy
https://www.justice.gov/epstein/files/DataSet%209/EFTA01112828.pdf
EFTA00674046Set 9
2017-03-0547p18,194w
promise. Manufacturing jobs lost to China are not coming back. First because of cheap
labor which has become an international commodity and secondly do to automation. Case in point ... training,
they're talking about inequality. In the knowledge economy, technological advancements make human
labor more efficient. But more work can be produced with fewer workers. A consequence of that ... unemployment, and downward
mobility. Those least likely to have an insurance policy that our labor market values are people for
whom higher education has always been a long shot: poor
https://www.justice.gov/epstein/files/DataSet%209/EFTA00674046.pdf
EFTA01086402Set 9
2010-12-0742p10,834w
Nooks 1 1,100 52.12:
Taal
20-14 PRODUCTION ASSISTANTS
ALL NON UNION LABOR
50
001 / PET SET PA 11
Prop 2 002/. 1 ISO =0
Shoot ... Total 59.3D,
23-08 CONSTRUCTION/PAINT LABOR
50
OCCOSTRUCTICti / GRPENTERS a GRIPS - Assuma Local 52
GWENT% Rabat at boa ratai
Paba/Shbat Day I 23.34 01,936
Ruinro ... Cnly Days I 75 53,000
Taal “.CO:
23-20 GREENS PURCHASES
001 / GREENS LABOR
Tler 2 Kay Camino a 526.16
ENIce bases Into Br<0 al UOaO Raw
Plop/Shoot/Wrap
https://www.justice.gov/epstein/files/DataSet%209/EFTA01086402.pdf
EFTA00263047Set 9
2018-08-2426p9,906w
January 2020, Morrison referred to the name as a "snarky comment" used
by the Labor Party to discredit him L2911271
Political career
Opposition (2007-2013)
Morrison sought Liberal preselection ... general election, Morrison suffered a two-party swing of over six percent against
Labor candidate Mark Buttigieg, but was able to retain the seat on the strength of winning ... February 2011, Morrison publicly
Morrison in 2009 questioned the decision of the Gillard Labor government to pay for the
relatives of the victims to travel to funerals in Sydney, arguing
https://www.justice.gov/epstein/files/DataSet%209/EFTA00263047.pdf