EFTA01839868Set 10
2012-02-226p836w
your request total estimated cost for project needing aggregate on LSJ (Stone,
Columbian Sand, & Manufactured Sand) is $38,216.66. (Trucking included
$6,561.00) Detail as followed below.
Grotto 35 yards ... cell
On Fcb 21, 2012, at 8:15 AM, Monique Harry wrote:
Current Inventory:
Manufacturing Sand - 2 loads
Columbian Sand - 1load
Stone - 2 loads
Projects Concrete will be used ... Rich,
Attached for your approval 3 LS3 purchase request for Heavy Material
1. Manufacturing Sand 500 tons = $26,120.00
2. Columbian Sand 500 tons = $40,400.00
3. #57 Stone
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01839868.pdf
EFTA00930482Set 9
2012-03-065p919w
your request total estimated cost for project needing aggregate on LSJ (Stone, Columbian Sand, &
Manufactured Sand) is $38,216.66. (Trucking included $6,561.00) Detail as followed below.
Grotto 35 yards ... cell
On Feb 21, 2012, at 8:15 AM, Monique Harry wrote:
Current Inventory:
Manufacturing Sand - 2 loads
Columbian Sand - 1 load
Stone - 2 loads
Projects Concrete will be used ... Rich,
Attached for your approval 3 LSJ purchase request for Heavy Material
1. Manufacturing Sand 500 tons = $26,120.00
2. Columbian Sand 500 tons = $40,400.00
3. #57 Stone
https://www.justice.gov/epstein/files/DataSet%209/EFTA00930482.pdf
EFTA00610463Set 9
2008-12-024p481w
Frame for Purchase/Repair:
Urgent:OX Inventory: O Other: O
Item/Items Requested: 200 ton of manufactured sand
*cher); Cd.1 eau ;01M
Purpose/Description: Misc. masonry,SWfte-Pavilion concreW
Company Name: Heavy Materials ... Thursday.
1) 200 tons of stone S 10,280
2) 200 tons of Manufactured Sand S 12,180
3) 200 tons of Colombian Sand S 17,680
Brice has signed
https://www.justice.gov/epstein/files/DataSet%209/EFTA00610463.pdf
EFTA00600499Set 9
2010-08-1310p914w
PRICE EXTENDED PRICE
ID/DESCRIPTION ORDERED SHIPPED
MFS
Ton 28.46 28.46 42.50 1,209.55
MANUFACTURED SAND
Metric Pounds Tons
Gross 37.57 82,820 41.41
11.75 * 25,900 * 12.95 $
Tare ... EFTA00600505
MANUFACTURED SAND - 500 Tons
Trip Ticket I/ Datc Ton Total Balance Ton
1 180764 5/5/2010 29.27 1,243.98 470.73
2 180803 5/6/2010 30.56 1,298.80 440.17
3 181127 5/13/2010
https://www.justice.gov/epstein/files/DataSet%209/EFTA00600499.pdf
EFTA01982597Set 10
2010-08-243p303w
Tons of Colombian Sand - $28,000.00
Barge - $3,040.00
Trucking - $4.320.00
500 Tons of Manufactured Sand - $21,250.00
Barge - $3,800.00
Trucking - $5,400.00
Total Material = $65,750.00
Total Barge
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01982597.pdf
EFTA00758142Set 9
2010-08-302p230w
Tons of Colombian Sand - $28,000.00
Barge - $3,040.00
Trucking - $4.320.00
500 Tons of Manufactured Sand - $21,250.00
Barge - $3,800.00
Trucking - $5,400.00
Total Material = $65,750.00
Total Barge
https://www.justice.gov/epstein/files/DataSet%209/EFTA00758142.pdf