EFTA00591096Set 9
2017-06-1533p7,299w
Green Roof
835.00
Painting
8,820.00
Wall Plaster
9,000.00
Roof Plaster
6,460.00
Parapet Wall
4,500.00
Terminating Bar
1,100.00
Single Ply Membrane
400.00
Remove Soil for Green ... First floor concrete beams $ 15,500
h. Concrete roof slab $ 31,000
i. Concrete parapet wall w/ cap flashing $ 5,250
j. Single-ply membrane at parapet and roof
https://www.justice.gov/epstein/files/DataSet%209/EFTA00591096.pdf
EFTA01146362Set 9
2012-09-1810p3,501w
BALCONIES
Complete New Roofing System of All Flat and Low Sloped Roof Areas and Parapet Walls: Using Duro-
Last Prefabricated Single-PlyPVC Roofing System
All Rite Construction, Inc. shall furnish ... reinforcing scrim- fused within a monolithically stable, thermoplastic co-polymer alloy.
The deck and parapet assemblies and all flashings will be directly heat-fused together. No tars, mastics, glues ... project named above. This work will include complete preparation
of roof and parapet wall surfaces and penetrations for proper installation of the roofing system in accordance
with manufacturer's specifications
https://www.justice.gov/epstein/files/DataSet%209/EFTA01146362.pdf
EFTA01124829Set 9
2012-09-1810p3,501w
BALCONIES
Complete New Roofing System of All Flat and Low Sloped Roof Areas and Parapet Walls: Using Duro-
Last Prefabricated Single-PlyPVC Roofing System
All Rite Construction, Inc. shall furnish ... reinforcing scrim- fused within a monolithically stable, thermoplastic co-polymer alloy.
The deck and parapet assemblies and all flashings will be directly heat-fused together. No tars, mastics, glues ... project named above. This work will include complete preparation
of roof and parapet wall surfaces and penetrations for proper installation of the roofing system in accordance
with manufacturer's specifications
https://www.justice.gov/epstein/files/DataSet%209/EFTA01124829.pdf
EFTA00606089Set 9
2012-09-1810p3,488w
BALCONIES
Complete New Roofing System of All Flat and Low Sloped Roof Areas and Parapet Walls: Using Duro-
Last Prefabricated Single-PlyPVC Roofing System
All Rite Construction, Inc. shall furnish ... reinforcing scrim- fused within a monolithically stable, thermoplastic co-polymer alloy.
The deck and parapet assemblies and all flashings will be directly heat-fused together. No tars, mastics, glues ... project named above. This work will include complete preparation
of roof and parapet wall surfaces and penetrations for proper installation of the roofing system in accordance
with manufacturers specifications; installing
https://www.justice.gov/epstein/files/DataSet%209/EFTA00606089.pdf
EFTA00258225Set 9
1990-06-2226p5,484w
Sewed
Ss EntrIsrRMvallwlDrawings
Prow* Y-0- hails AAA wing —
Ne. Lennon,.
and Back Parapet Wad
SA A-11,11er Details
A403
z IA/II Mal hoe
IM
PAM MU Copp.
Osikiang ... Eapawafre joii AI
Parapet i C•314
(0 I
F ref
tr;
aor
we
S f tlri
— ., ... -a -
--.:.-=
r:i
_ ,
rt.
—./
7-7 ; ar .‘ 41 1.11. '.:Q.I
warm ... F.ttgI
A • l ane"' DArled
Af tni4371
< A-107 1- 1
• 4W PARAPET
•Mt a 1,41Itel
-6: /14e
t EL
Lids' Wheel 440
44 reeked
https://www.justice.gov/epstein/files/DataSet%209/EFTA00258225.pdf
EFTA00595276Set 9
2009-01-096p654w
throughout e entire roof. The material will run up to the top of the
parapets and be secu :d with tcrmii ation bar and screws. The canales will
be lined ... roofpenetrations will be booted. All
seams not fused toge her (penetrati ns, canales, parapets) will be caulked at
the top, with a one c mponent ureti The FrvAc unit will
https://www.justice.gov/epstein/files/DataSet%209/EFTA00595276.pdf