EFTA01109946Set 9
2013-02-0121p5,806w
follows:
1. Solar under WAPA's Net Metering Program — Install a 100 kWAc solar photovoltaic
system, remain connected to WAPA's grid and purchase all additional power at WAPA ... kilowatt demand (kW) with exporting power
to the grid — Install a 200 kWAc solar photovoltaic system, remain connected to WAPA's
grid and purchase all additional power at WAPA ... required to power the island
continuously for 24 hours — Install a 500 kWAc solar Photovoltaic System along with 200
kW4c, (1,998 kWhAc) of battery storage and disconnect from WAPA
https://www.justice.gov/epstein/files/DataSet%209/EFTA01109946.pdf
EFTA01109967Set 9
2013-02-2219p5,498w
follows:
1. Solar under WAPA's Net Metering Program — Install a 100 kWAc solar photovoltaic system on the
rooftops of the generator and desalinization plant buildings, remain connected to WAPA ... Install a 100 kWAc wind turbine at the Kite House, a 70 kWAc solar photovoltaic system on the
roof of the desalinization plant and a 100 kW/100 kWh load leveling ... Maximize solar and wind to disconnect from WAPA — Install a 100 kWAc solar photovoltaic
system on the rooftops of the generator and desalinization plant buildings, a 150 kWAc solar
photovoltaic
https://www.justice.gov/epstein/files/DataSet%209/EFTA01109967.pdf