EFTA00956071Set 9
2013-03-153p592w
wrote:
Rich B and I both followed up this week (numerous phone calls) with Pierpont (other bidder on this job)
whose original bid came in at 330,000.
Their ... Electrical and Protection which Rich B estimated to be approximately 20,000 - 30,000.
Pierpont came to the house last week and was supposed to have new proposal this week
https://www.justice.gov/epstein/files/DataSet%209/EFTA00956071.pdf
EFTA00956077Set 9
2013-03-153p594w
wrote:
Rich B and I both followed up this week (numerous phone calls) with Pierpont (other bidder on this job)
whose original bid came in at 330,000.
Their ... Electrical and Protection which Rich B estimated to be approximately 20,000 - 30,000.
Pierpont came to the house last week and was supposed to have new proposal this week
https://www.justice.gov/epstein/files/DataSet%209/EFTA00956077.pdf
EFTA01112008Set 9
2012-11-293p573w
late winter early spring
time. AD .Winston$357,255.00, Power Cooling
$395,000.00, Pierpont $330,000.00 no
electrical included.
EFTA01112008
LSJ
• Library ac unit, we received two proposals to remove
https://www.justice.gov/epstein/files/DataSet%209/EFTA01112008.pdf