EFTA00594361Set 9
2014-06-0615p3,644w
lost capacity from the Dakota well, which is out of service with a dropped pump. In reviewing whether
Well 6 is suitable to make up for lost Dakota capacity, Balleau ... determine the capacity and sustainable yield. In May
2014, Rodgers and Co. pulled the pump 6 and rehabilitated the well, then installed a temporary pump
for testing. The Ranch authorized ... Well 6 rehabilitation and
testing, projects the well capacity and yield, and recommends a pump capacity. We find the well to be
capable of 15 gpm pumping for 10 hours
https://www.justice.gov/epstein/files/DataSet%209/EFTA00594361.pdf
EFTA01124856Set 9
2014-06-0615p3,645w
lost capacity from the Dakota well, which is out of service with a dropped pump. In reviewing whether
Well 6 is suitable to make up for lost Dakota capacity, Balleau ... determine the capacity and sustainable yield. In May
2014, Rodgers and Co. pulled the pump 6 and rehabilitated the well, then installed a temporary pump
for testing. The Ranch authorized ... Well 6 rehabilitation and
testing, projects the well capacity and yield, and recommends a pump capacity. We find the well to be
capable of 15 gpm pumping for 10 hours
https://www.justice.gov/epstein/files/DataSet%209/EFTA01124856.pdf
EFTA01080045Set 9
2013-10-0736p13,663w
bulbous bow high
level floats, the void telltale flooding valve, the void submersible pump discharge
through-hull with screw down non return valve, and the chain bin drain piping ... associated
ducting
• (2) EVAC system grey water interface sumps
• Bulbous bow bilge pump control panel
• Bow thruster system control station unit
• ABB bow thruster speed drive/soft start
• Dry chemical portable ... plywood dunnage and shelving with
organized spares. It is protected by the central bilge pumping system pickup and a
high level alarm. Located in this space is the ABB Motors
https://www.justice.gov/epstein/files/DataSet%209/EFTA01080045.pdf
EFTA00807650Set 9
2018-06-3028p7,027w
serve as a standby water supply.
The overall treatment process will consist of seawater pumping from the existing intake, media filtration,
cartridge filtration, the addition of a trace quantity ... scale formation or equipment corrosion during periods of shutdown.
The proposed membrane feed pump is a Danfoss APP8.2 positive displacement axial piston pump
constructed from 2205/2507 duplex stainless steel. Operating ... parallel with the membrane feed pump
will be a single ERI energy recovery device. This design provides the lowest possible energy usage and
the greatest degree of flexibility, while maintaining
https://www.justice.gov/epstein/files/DataSet%209/EFTA00807650.pdf
EFTA00804962Set 9
2018-10-1512p3,944w
PROPOSAL TO
Mr. Brice Gordan
For
REPLACEMENT OF THE SEAWATER
SUPPLY PUMPING STATION
The Saint James Group
UNITED STATES VIRGIN ISLANDS
15 OCTOBER 2018
PROPOSAL NUMBER 045-10152018
EFTA00804962
Table ... serve the Little St. James desalination
and commissioning of a new seawater intake pumping
been sized to meet the current feedwater and pressure
system. The proposed seawater supply system ... gallons per day (GPD).
rs, new PVC piping, priming system, and two
The upgrades pump station will consist of four basket straine
requirements of the desalination plant. Each pump
intake
https://www.justice.gov/epstein/files/DataSet%209/EFTA00804962.pdf
EFTA01122646Set 9
78p28,263w
each
generator. Each generator drive unit contains its own integral oil supply and
pumps. So that the oil pressure within the unit can be monitored, a low oil
pressure light ... generator.
Heavy load items, such as air conditioning pack fans, galleys, and hydraulic
"B" pumps are powered directly from the load busses. Power is also sent to
the various circuit ... operate a system "B" pump with less than 1,300 lbs in fuel tank Not
Any one hydraulic system "B" pump should not be operated more than 5
times
https://www.justice.gov/epstein/files/DataSet%209/EFTA01122646.pdf
EFTA01083560Set 9
65p11,709w
when required.
The systems are as follows:
Refrigeration Chillers
Cooling Towers
Main Air Handlers
Pumps Pl-P7
Air Handlers ... strictly prohibited and
may be unlawful.
0 2013 Jeffrey Epstein - All rights reserved'
EFTA01083604
Pumps P1— P7
P1, P2, P3 - Cooling Tower pumps
P4, P5- Chilled Water pumps ... Heat, Hot Water Pumps
Daily Schedule
I. Check pump pressure supply return.
2. Check pump seal for leaks (floor has leak detection).
Weekly Schedule
I. Check for bearing noise/seal ware
https://www.justice.gov/epstein/files/DataSet%209/EFTA01083560.pdf
EFTA01083536Set 9
24p3,145w
when required.
The systems are as follows:
Refrigeration Chillers
Cooling Towers
Main Air Handlers
Pumps Pl-P7
Air Handlers ... strictly prohibited and
may be unlawful.
0 2013 Jeffrey Epstein — All rights reserved"
EFTA01083544
Pumps P1— P7
P1, P2, P3 - Cooling Tower pumps
P4, P5- Chilled Water pumps ... Heat, Hot Water Pumps
Daily Schedule
I. Check pump pressure supply return.
2. Check pump seal for leaks (floor has leak detection).
Weekly Schedule
I. Check for bearing noise/seal ware
https://www.justice.gov/epstein/files/DataSet%209/EFTA01083536.pdf
EFTA01733626Set 10
53p9,767w
when required.
The systems are as follows:
Refrigeration Chillers
Cooling Towers
Main Air Handlers
Pumps P I -P7
Air Handlers ... unlawful.
0 2013 Jeffrey Epstein - All rights reserved"
EFTA_R1_00008043
EFTA01733658
Pumps PI — P7
PI, P2, P3 - Cooling Tower pumps
P4, P5- Chilled Water pumps
P6, P7- Re Heat ... Water Pumps
Daily Schedule
I. Check pump pressure supply return.
2. Check pump seal for leaks (floor has leak detection).
Weekly Schedule
I. Check for bearing noise/seal ware.
2. Check
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01733626.pdf
EFTA01083625Set 9
71p13,096w
further reference.
The systems are as follows:
Refrigeration Chillers
Cooling Towers
Main Air Handlers
Pumps Pl-P7
Hot Water Heating Reheating
Air Handlers ... strictly
prohibited and may be unlawful.
0 2013 Jeffrey Epstein - All rights reserved'
EFTA01083674
Pumps P1— P7
P1, P2, P3 - Cooling Tower pumps
P4, P5- Chilled Water pumps ... Heat, Hot Water Pumps
Daily Schedule
I. Check pump pressure supply return.
2. Check pump seal for leaks (floor has leak detection).
Weekly Schedule
I. Check for bearing noise/seal ware
https://www.justice.gov/epstein/files/DataSet%209/EFTA01083625.pdf
EFTA00587296Set 9
71p13,138w
further reference.
The systems are as follows:
Refrigeration Chillers
Cooling Towers
Main Air Handlers
Pumps Pl-P7
Hot Water Heating Reheating
Air Handlers ... strictly
prohibited and may be unlawful.
0 2013 Jeffrey Epstein - All rights reserved'
EFTA00587345
Pumps P1— P7
P1, P2, P3 - Cooling Tower pumps
P4, P5- Chilled Water pumps ... Heat, Hot Water Pumps
Daily Schedule
I. Check pump pressure supply return.
2. Check pump seal for leaks (floor has leak detection).
Weekly Schedule
I. Check for bearing noise/seal ware
https://www.justice.gov/epstein/files/DataSet%209/EFTA00587296.pdf