EFTA00589044Set 9
2012-09-266p1,589w
File No.
NEW MEXICO OFFICE OF THE STATE ENGINEER
APPLICATION FOR PERMIT TO CHANGE AN EXISTING WATER RIGHT
(Non 72-12-1)
(check applicable boxes):
For fees see State Engineer ... best of (my, our) knowledge and belief.
Applicant Signature Applicant Signature
ACTION OF THE STATE ENGINEER
This application is:
approved 0 partially approved 0 denied
provided it is not exercised ... conditions of approval.
Witness my hand and seal this day of 20 , for the State Engineer,
State Engineer
By:
Signature Print
Title:
Print
FOR 0SE INTERNAL USE Application for Permit
https://www.justice.gov/epstein/files/DataSet%209/EFTA00589044.pdf
EFTA00594361Set 9
2014-06-0615p3,644w
Bottom or Cmacat
rainibt enrand 1
2
SON Engager Repreelatatlyt
4
FOR USE OF STATE ENGINEER
Data RooN•red ONLY
Child aR ESL
Fie No
Loads No
EFTA00594370 ... Describe plugging method
Name of plugging contractor
8. Tell Record filed with State Engineer's Office, Yes (as cn5902)
(Yea or No)
of Glorieta Geoscience, Inc., agent for the spelt ... Jeffrer Epsr p, Zo/ro Ranch Detainee -0
ar -61 0
S
OW
STATEMENT OF STATE ENGINEER'S REPRESENTATIVE
I hereby certify that I have inspected the above well and find
https://www.justice.gov/epstein/files/DataSet%209/EFTA00594361.pdf
EFTA01124856Set 9
2014-06-0615p3,645w
Bottom or Cmacat
rainibt enrand 1
2
SON Engager Repreelatatlyt
4
FOR USE OF STATE ENGINEER
Data RooN•red ONLY
Child aR ESL
Fie No
Loads No
EFTA01124865 ... Describe plugging method
Name of plugging contactor
8. Tell Record filed with State Engineer's Office, Yes (as c:5902)
(Tea or No)
of Glorieta Geoscience, Inc., agent ... Epsr p, Zo/ro Ranch Petaittee -0
ar 1u2 -61 0
S
OW
STATEMENT OF STATE ENGINEER'S REPRESENTATIVE
I hereby certify that I have inspected the above well and find
https://www.justice.gov/epstein/files/DataSet%209/EFTA01124856.pdf
EFTA00610072Set 9
2014-04-095p2,432w
permit will have some administrative permitting
barriers. The Estancia Basin Administrative Guidelines that the State Engineer uses to guide
permitting on water transfers in that basin define the valley fill ... Darren Indyke, PLLC. 3
April 9, 2014
Critical Management Area (CMA). Generally, the State Engineer will deny applications that
cause additional depletion or drawdown to aquifers designated as CMA. Because
https://www.justice.gov/epstein/files/DataSet%209/EFTA00610072.pdf
EFTA01087320Set 9
2014-04-096p2,566w
permit will have some administrative permitting
barriers. The Estancia Basin Administrative Guidelines that the State Engineer uses to guide
permitting on water transfers in that basin define the valley fill ... Darren Indyke, PLLC. 3
April 9, 2014
Critical Management Area (CMA). Generally, the State Engineer will deny applications that
cause additional depletion or drawdown to aquifers designated as CMA. Because
https://www.justice.gov/epstein/files/DataSet%209/EFTA01087320.pdf
EFTA01083175Set 9
2003-03-211p421w
CHANGE AN EXISTING WATER RIGHT
CYPRESS, INC.
EXHIBIT B
On March 21, 2003, the State Engineer approved Permit No. E-7871 et als. to appropriate 68
acre-feet of water ... approved to be drilled within the Mancos Shale formation. On March 9, the
State Engineer approved a change location of well for E-7871-S. In the conditions of approval
https://www.justice.gov/epstein/files/DataSet%209/EFTA01083175.pdf