EFTA00298097Set 9
2011-11-0120p7,411w
This Territorial Pollutant Discharge Elimination System (TPDES) permit is issued in compliance with 12 V.I. CODE
ANN. § 185 in accordance with the provisions of the Federal Water Pollution Control ... collection system(s) outfalls.
BEST PROFESSIONAL CONDOMINIUMS/ HOTELS/RESORTS/MARINAS 12/O
JUDGMENT (BPJ) (STT-STJ) MINOR TPDES Permit
CATEGORY - R.L.L. Little St. James Subwatershed
TPDES Permit No. Wastewater Process Daily Monthly Disinfection ... Drainage System
Date Original Application Received: 3/11/11 Date Completed Application Received: 7/29/11
TPDES Permit Administrator: to, 2.
Rhonda L Liburd,
Date: /1/f2/j/_
Program Manager Approval: eLtei Date:11,2/1i
https://www.justice.gov/epstein/files/DataSet%209/EFTA00298097.pdf
EFTA00978020Set 9
2018-06-196p2,015w
NPDESeReporting®epa.goir.
If you have any questions feel free to email or call the TPDES staff as needed as well.
Benjamin Keularts
Environmental Program Manager, WPC/WQM
Division of Environmental Protection ... message and all copies.
On 6/15/2018 3:36 PM, Benjamin Keularts wrote:
To All TPDES Permit Holders:
As noted in the previous email on March 8, 2018, the TPDES Permitting ... extended reprieve
from reporting requirements via NetDMR's website, as normally required by your TPDES Permit.
However, as of June I, 2018, all data that was otherwise due between September
https://www.justice.gov/epstein/files/DataSet%209/EFTA00978020.pdf
EFTA00807650Set 9
2018-06-3028p7,027w
SEAMIATER SVSTEM l_l_C PACE -±E• CF PEI
EFTA00807665
Instrumentation Concentrate Low/Plant Discharge (TPDES Permit) Pressure Flow
Manufacturer ABB or equal
Type Magnetic
Connections 1" 150-pound Flange Insert ... Range, GPM 0 to 50
Number Provided 1
Instrumentation Plant Discharge (TPDES Permit) pH and Temperature
Manufacturer Shark or equal
Range, pH units 1 to 13
Range, temperature ... fault
ER Boost Pump failure to start Yes Yes PX balancing and TPDES Permit
Compliance
Plant discharge flow Yes Yes
Membrane permeate flow Yes Yes
Membrane differential pressure
https://www.justice.gov/epstein/files/DataSet%209/EFTA00807650.pdf
EFTA02026396Set 10
2011-12-153p1,169w
understand and from my review of the documents — there are CZM permits, building permits, TPDES permits
and DPNR/DEP Permits to Operate, Authority to Construct.
EFTA_R1_00534276
EFTA02026396
• Transfer ... entity remains the same, the process can be completed by affidavit.
• Transfer of TPDES Permits: These can be transferred automatically under the Regs. 12 V.I.R. 164.71
requires 30 day notice
https://www.justice.gov/epstein/files/DataSet%2010/EFTA02026396.pdf
EFTA01116651Set 9
2015-12-312p729w
Ruins and endangered species surveys and approval, FAA DC & Atlanta Clearance, as well as
TPDES permits, CZM Major Permit through April 2015, and CZM extension through April 2016,
❑ ITC (investment
https://www.justice.gov/epstein/files/DataSet%209/EFTA01116651.pdf