EFTA00604303Set 9
2014-06-171p218w
organic materials from sub base.
o Compact sub base to insure stability
o Apply Tack Coat prior to asphalt placement.
o Place new 2 inch asphalt overlay.
• The areas ... Costs of work;
o Site Preparation (includes removal of organic material) $37,000.00
o Tack Coat =1,950 GAL @ $16.00 per $31,200.00
o Asphalt Paving = 1,500 Tons
https://www.justice.gov/epstein/files/DataSet%209/EFTA00604303.pdf
EFTA00608223Set 9
2017-06-282p271w
insure stability
• Spread and compact 3 inches of owner-supplied aggregate base material
• Apply Tack Coat prior to asphalt concrete placement
• Place new 2-inch asphalt concrete overlay
SPECIAL CONDITIONS ... Cost
Asphalt Concrete Paving
Plant mixed bituminous concrete 1 .5( ) $370.00 Ton $555,000.00
Tack Coat 1.950 $16.00 Gal. $31,200.00
Asphalt Concrete Paving Subtotal: $586,200.00
Grading
Fine grading
https://www.justice.gov/epstein/files/DataSet%209/EFTA00608223.pdf
EFTA01087963Set 9
2013-10-312p248w
ground work, spreading of aggregate base,
material for building of new tennis court, applying tack coat primer, then paving of said area of
approximately 800 sq. yds. in separate layers
https://www.justice.gov/epstein/files/DataSet%209/EFTA01087963.pdf
EFTA01087965Set 9
2013-10-312p252w
ground work, spreading of aggregate base,
material for building of new tennis court, applying tack coat primer, then paving of said area of
approximately 800 sq. yds. in separate layers
https://www.justice.gov/epstein/files/DataSet%209/EFTA01087965.pdf