EFTA01074795Set 9
2012-11-0761p10,883w
Baseboard • 4 1/4" hardwood 96.50 LP@ 7.95 = 767.18
61. replace 24" x 24" slab terrazzo floor 10% waste added 399.00 SP@ 75.00 - 29,925.00
62. replace metal partition walls with ... hardwood 35.33 LF @ 7.95 a 280.87
74. replace 24" x 24" slab terrazzo floor 10% waste added 71.00 SF @ 75.00 a 5,325.00
75. replace imported glass tile walls ... floor heating system 29.00 SF @ 18.85 a 546.65
87. replace 24" x 24" slab terrazzo floor 10% waste added 32.00 SF @ 75.03 a 2,400.00
88. Drywall replacement
https://www.justice.gov/epstein/files/DataSet%209/EFTA01074795.pdf
EFTA01191992Set 9
2014-02-053p588w
held at The Phoenician Resort unless otherwise noted
1:00pm Welcome Lunch in II Terrazzo, The Phoenician
• Vegetarian and meat options will be available at all meals
2:00pm Violence ... Phoenician Resort unless otherwise noted
Saturday, April 5
8:00am Breakfast in 11 Terrazzo
9:00am External Advisory Board Meeting - Estrella Theatre
• Review of recent activities and strategic plan ... Coffee Break
10:45am Discussion of future themed workshops
12:00pm Lunch in 11 Terrazzo
1:00pm-4pm Optional Private Meetings For Epstein with
Venter, Horvitz, Bayer, and others, Room
https://www.justice.gov/epstein/files/DataSet%209/EFTA01191992.pdf
EFTA01078478Set 9
2014-06-1731p13,124w
ceiling tiles, mirror mastic, pipe insulation, radiator cabinet
insulation, boiler joint sealant, brick mortar, terrazzo flooring, 2 types of
linoleum (red and green) and associated mastic
https://www.justice.gov/epstein/files/DataSet%209/EFTA01078478.pdf