EFTA01261592Set 9
2020-02-24398p64,867w
through the GPS port and a UAT Antenna (TSO-C86c) p/n CI710.40.30. s/n 522354 at Ma.
35.1 for the FIS-B weather function.
c) Installed a Garmin Flight Stream ... pilots manual holder
at sta 136, interfaced to the GDL-88 UAT. The Flight Stream 110 provides FIS-B weather, ADS-B traffic, and GPS
position data ... reusing the existing aircraft wiring. This modification also includes a Garmin G
88 GPS / UAT and optional Flight Stream 110 Bluetooth FIS-B installation. A GPS and UAT-SBS antenna
https://www.justice.gov/epstein/files/DataSet%209/EFTA01261592.pdf
EFTA01368861Set 10
2012-06-081p424w
supported by vendors and
become compliant with Technology Roadmap. This includes new servers for UAT,
Production & Disaster Recovery: upgrading Windows server o/s and SQL Server database;
and upgrading Prime Compliance ... Server 2008 R1GTO request for a server exception from DB
London was rejected.
• UAT started on June 10, 2013. A number of rules needed to be configured and tested using ... Semi-Annual Fuzzy Logic Testing
• Testing of Prime OFAC Fuzzy Logic in UAT was completed on February 27, 2013. Cross-
field validation still not working as expected. Worked with
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01368861.pdf
EFTA01370307Set 10
2012-06-081p424w
supported by vendors and
become compliant with Technology Roadmap. This includes new servers for UAT,
Production & Disaster Recovery: upgrading Windows server o/s and SQL Server database;
and upgrading Prime Compliance ... Server 2008 R1GTO request for a server exception from DB
London was rejected.
• UAT started on June 10, 2013. A number of rules needed to be configured and tested using ... Semi-Annual Fuzzy Logic Testing
• Testing of Prime OFAC Fuzzy Logic in UAT was completed on February 27, 2013. Cross-
field validation still not working as expected. Worked with
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01370307.pdf
EFTA01413503Set 10
2012-06-0819p2,104w
supported by
vendors and become compliant with Technology Roadmap. This includes new
servers for UAT, Production & Disaster Recovery; upgrading Windows server o/-
s and SQL Server database; and upgrading Prime ... Server 2008 R1GTO request for a server exception from DB London was
rejected.
UAT started on June 10, 2013. A number of rules needed to be configured and
tested using ... Semi-Annual Fuzzy Logic Testing
Testing of Prime OFAC Fuzzy Logic in UAT was completed on February 27,
2013. Cross-field validation still not working as expected. Worked with
EFTA01413503
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01413503.pdf
EFTA00024175Set 8
45p35,453w
sampe pan c pat on n abuse of 1,621 eva uat on strateg es: us ng se f-harm ng behav on F nd ngs end support to stud ... pants—not in ted to CSA
express the r abuse f nd ngs. Eva uat on regard ng consequences to d sc osure. SW, / vors
exper ences? (3) What forms ... Barter, and Fa rho m abuse d sc osure nonrepresentat ve 1,099 eva uat on forms w th ess than one quarter of youth prov
https://www.justice.gov/epstein/files/DataSet%208/EFTA00024175.pdf
EFTA01413446Set 10
2013-02-2719p1,901w
progress.
Semi-Annual Fuzzy Logic Testing
Testing of Prime OFAC Fuzzy Logic in UAT was completed on February 27,
2013. Cross-field validation still not working as expected. Worked with ... test Production data in UAT before implementing changes in
Production. However, due to issues with UAT environment, changes could not
be made.
Received training material from FIS. Plan ... test in 8.0.2 and 9.1 UAT
environments after all other UAT testing (for Prime upgrade) has been
completed.
Testing was not done in 2013 as Clarissa Delafuente was on maternity
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01413446.pdf
EFTA01370279Set 10
2013-02-271p368w
progress.
Semi-Annual Fuzzy Logic Testing
• Testing of Prime OFAC Fuzzy Logic in UAT was completed on February 27, 2013. Cross-
field validation still not working as expected. Worked with ... test Production data in UAT
before implementing changes in Production. However, due to issues with UAT environment,
changes could not be made.
• Received training material from FIS. Plan ... test in 8.0.2 and 9.1 UAT environments after
all other UAT testing (for Prime upgrade) has been completed.
• Testing was not done in 2013 as Clarissa Delafuente was on maternity
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01370279.pdf
EFTA01413404Set 10
2013-02-2719p1,916w
progress.
Semi-Annual Fuzzy Logic Testing
Testing of Prime OFAC Fuzzy Logic in UAT was completed on February 27,
2013. Cross-field validation still not working as expected. Worked with ... test Production data in UAT before implementing changes in
Production. However, due to issues with UAT environment, changes could not
be made.
Received training material from FIS. Plan ... test in 8.0.2 and 9.1 UAT
environments after all other UAT testing (for Prime upgrade) has been
completed.
Testing was not done in 2013 as Clarissa Delafuente was on maternity
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01413404.pdf
EFTA00134933Set 9
2007-04-0525p8,770w
ailable
The Prog ra m Co or
en su re th at ad eq uate coverage is av
st n for training,
executive staff, mu nt from the institutio ... ation, or immediately pla
the inmate on suicide watch.
ately
rge ncy sit uat ion s, the Shi ft Lieutenant will immedi
In eme that in
watch. It should ... locate this item at the sta sit uat ion s.
in emergency
only authorized to be used l
s too l is not permitted and wil
Miscellaneous
https://www.justice.gov/epstein/files/DataSet%209/EFTA00134933.pdf