EFTA01124619Set 9
2013-04-276p985w
mail: zorroranch@aol.com
Project Request and Approval
Date Requested: D5/09/13 Requested by
Project Name: Yurt Refurbishment Project No.: Location: _ower Circle Road
Manufacturer / Vendor: Pacific Yurts
Attached Estimates ... please attach all quotes, if no please explain why not?
company manufactured existing Yurt. Shipping charges estimated paid COD upon arrival by ZDC
ApprovalDote: 4/27/13
ApprovedBy:
CAFSkeit
Approval for additions ... Customer ID#:
5/2/2013
32243
item Price Each Extended
Side cover for 24' tall wall yurt (beige vinyl) -6 windows (& twist locks) $ 2,875.00 1 $ 2,875.00
Top cover
https://www.justice.gov/epstein/files/DataSet%209/EFTA01124619.pdf
EFTA00960805Set 9
2013-05-091p136w
From: Brice Gordon <
To: Jeffrey Epstein <jecvacation(kgmail.com>
Subject: Yurt Refurbishment
Date: Thu, 09 May 2013 20:20:00 +0000
Attachments: ZDC PROJECT 23 YURT 050913.pdf
Jeffrey
resending
Attached Project ... Request & Approval for the Yurt Refurbishment
Pacific Yurt does not handle the shipping, we would need to confirm the price closer to the delivery date and then this would
have ... paid COD
8 to 10 weeks to get on site, before arrival, Yurt needs to be emptied, wooden roof & walls deconstructed, stone base
repaired, floor sanded, resurfaced and roof & walls
https://www.justice.gov/epstein/files/DataSet%209/EFTA00960805.pdf
EFTA01975508Set 10
2013-05-092p235w
Jeffrey Epstein
Sent Thur 5/9/2013 7:49:17 PM
Subject Re: ZDC_PROJECT_23_YURT 050913
cannot open,
On Thu, May 9, 2013 at 11:09 AM, Zorro Ranch ... wrote:
Good Morning Rich,
Attached Project Request & Approval for the Yurt Refurbishment
Pacific Yurt does not handle the shipping, we would need to confirm the price closer to the
delivery ... paid COD
8 to 10 weeks to get on site, before arrival, Yurt needs to be emptied, wooden roof & walls
deconstructed, stone base repaired, floor sanded, resurfaced and roof & walls
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01975508.pdf
EFTA00960776Set 9
2013-05-091p143w
Rich Kahn
Cc: Bella Klein ..tj >, Jeffrey Epstein <jeevacation@gmail.com>
Subject: ZDC_PROJECT_23_YURT_050913
Date: Thu, 09 May 2013 15:09:28 +0000
Attachments: ZDC_PROJECT_23_YURT_050913.pdf
Good Morning Rich,
Attached ... Project Request & Approval for the Yurt Refurbishment
Pacific Yurt does not handle the shipping, we would need to confirm the price closer to the delivery date and then
this would ... paid COD
8 to 10 weeks to get on site, before arrival, Yurt needs to be emptied, wooden roof & walls deconstructed, stone
base repaired, floor sanded, resurfaced and roof & walls
https://www.justice.gov/epstein/files/DataSet%209/EFTA00960776.pdf
TURNED INTO GLORIETA GEOSCIENCE
■ CHECK WATER PUMPS, RESIVOIR, ALL WELLS, LOG CABIN, GUEST
LODGE, YURT FOR WATER LEAKS
■ CHECK PERIMETER FENCES AND LOCKS
■ CHECK FOR MICE AT LOG CABIN, LODGE ... YURT
■ CHECK FOR BIRD NESTS AT LOG CABIN, LODGE AND YURT
■ CHECK HEATERS IN POLE BARN
EVERY TWO WEEKS
■ CHECK BATTERY BACK UPS AROUND RANCH
■ CHANGE MOUSE TRAPS YURT, LODGE
https://www.justice.gov/epstein/files/DataSet%209/EFTA00586047.pdf
TURNED INTO GLORIETA GEOSCIENCE
■ CHECK WATER PUMPS, RESIVOIR, ALL WELLS, LOG CABIN, GUEST
LODGE, YURT FOR WATER LEAKS
■ CHECK PERIMETER FENCES AND LOCKS
• CHECK FOR MICE AT LOG CABIN, LODGE ... YURT
• CHECK FOR BIRD NESTS AT LOG CABIN, LODGE AND YURT
• CHECK HEATERS IN POLE BARN
EVERY TWO WEEKS
• CHECK BATTERY BACK UPS AROUND RANCH
■ CHANGE MOUSE TRAPS YURT, LODGE
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01733689.pdf
EFTA01971644Set 10
2013-05-091p228w
Brice Gordon
From: Jeffrey Epstein
Sent Thur 5/9/2013 8:34:38 PM
Subject: Re: Yurt Refurbishment
do it
On Thu, May 9, 2013 at 4:20 PM, Brice Gordon ... wrote:
Jeffrey
resending
Attached Project Request & Approval for the Yurt Refurbishment
Pacific Yurt does not handle the shipping, we would need to confirm the price closer to the delivery date ... paid COD
8 to 10 weeks to get on site, before arrival, Yurt needs to be emptied, wooden roof & walls deconstructed,
stone base repaired, floor sanded, resurfaced and roof & walls
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01971644.pdf
TURNED INTO GLORIETA GEOSCIENCE
■ CHECK WATER PUMPS, RESIVOIR, ALL WELLS, LOG CABIN, GUEST
LODGE, YURT FOR WATER LEAKS
■ CHECK PERIMETER FENCES AND LOCKS
■ CHECK FOR MICE AT LOG CABIN, LODGE ... YURT
■ CHECK FOR BIRD NESTS AT LOG CABIN, LODGE AND YURT
■ CHECK HEATERS IN POLE BARN
EVERY TWO WEEKS
■ CHECK BATTERY BACK UPS AROUND RANCH
■ CHANGE MOUSE TRAPS YURT, LODGE
https://www.justice.gov/epstein/files/DataSet%209/EFTA00586061.pdf
EFTA01971873Set 10
2013-05-092p256w
Richard Kahn[ ; ZDC
From: BMG
Sent: Thur 5/9/2013 9:03:00 PM
Subject: Re: Yurt Refurbishment
Ok
Brice Gordon
49 Zorro Ranch Rd
Stanley ... Brice Gordon wrote:
Jeffrey
resending
Attached Project Request & Approval for the Yurt Refurbishment
Pacific Yurt does not handle the shipping, we would need to confirm the price closer ... paid COD
8 to 10 weeks to get on site, before arrival, Yurt needs to be emptied, wooden roof & walls
deconstructed, stone base repaired, floor sanded, resurfaced and roof & walls
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01971873.pdf
EFTA01966346Set 10
2013-07-231p161w
From: Jeffrey
Sent: Tue 7/23/2013 5:53:33 PM
Subject: Re: Yurt
yes
On Tue, Jul 23, 2013 at 1:52 PM, BMG wrote:
Jeffrey ... help with the removal and installing of the new siding and roof on
the yurt
850 for 2 men for 2 days
Scheduled for Thursday Friday this week
https://www.justice.gov/epstein/files/DataSet%2010/EFTA01966346.pdf