approximate dates, to be confirmed, pending
authorization by Client to proceed with each phase):
• Schematic Design (approx 6 weeks): December 2008
• Design Development (approx 8 weeks): April 2009
• Construction Documents ... information regarding specific scope in each
portion of the project.
phase One - Design
1. Schematic Design. Based on the approved Conceptual Design and Client's
authorization to proceed, Gensler will ... develop the Schematic Design, consisting
of:
a) Site plan;
b) Building elevations;
c) Typical building sections;
d) Floor plans;
e) Outline description of building systems included in Gensler's scope
https://www.justice.gov/epstein/files/DataSet%209/EFTA00605620.pdf
EFTA00724806Set 9
2009-10-0618p5,931w
approximate dates, to be confirmed, pending
authorization by Client to proceed with each phase):
• Schematic Design (approx 6 weeks): December 2008
• Design Development (approx 8 weeks): April 2009
• Construction Documents ... information regarding specific scope in each
portion of the project.
phase One - Design
1. Schematic Design. Based on the approved Conceptual Design and Client's
authorization to proceed, Gensler will ... develop the Schematic Design, consisting
of:
a) Site plan;
b) Building elevations;
c) Typical building sections;
d) Floor plans;
e) Outline description of building systems included in Gensler's scope
https://www.justice.gov/epstein/files/DataSet%209/EFTA00724806.pdf
EFTA00727668Set 9
15p4,076w
pRoSIED MCKEL OP EaNtp MA BY IILLWCPXER tIPROIDE Slpittim, .,, , . ,. - -. - -P, i
Co Li SCHEMATIC DESIGN
S.93 CLCGriet LUDES DRAAER OLCCS Pa FROSTED ?ECKEL tOR MAL? SA BY MILL'ACEIXER IPROVME ... LOOTS
ILL
TOMUNIDER
CESEEUGHTING I TOMMOMS
oB
C
I A PRASE:
TOONE
SCHEMATIC DESIGN
MOP/ ' 1 DESIGN DEVELOPMENT
ST
H PEWIT DOCUMENT
i LJ SID DOCUMENT
WEENIER TO/LL PEAMETER • CONSTRUCTION ... KITCHEN: INTERIOR ELEVATION - LOOKING WEST
SCPLE:I/r•ILEr
PHASE:
SCHEMATIC DESIGN
NOTE • I DESIGN DEVELOPMENT
tH 60CIRIP PENDANT DINT MIMS FOR
NMI /MOM PRIOR TO INSTNallOtt H PEWIT DOCUMENT
EFTA00259369Set 9
2009-06-0459p5,190w
QUARTERS TO STUDY PATH &
LITTLE ST. JAMES ISLAND PROJECT
STAIR IMAGERY
', A , ROJECT #: GNS6909
SCHEMATIC DESIGN
S W A Ll
06/04/2009 800/0 DD Progress Package, Consultant's SD Package ... MAIN HOUSE AREA
SWA PROJECT K: GNSn909
DATE: 06/03/09
LITTLE ST. JAMES ISLAND PROJECT
SCHEMATIC DESIGN
S W A L3
24
EFTA00259393
PLANT LEGEND
PALMS
Cocos nucifera COCONUT PALM
Sabal ... MAIN HOUSE AREA
LITTLE ST. JAMES ISLAND PROJECT
LA" Scan ' " = 20"
A PROJECT #: GNSn909 SCHEMATIC DESIGN
S W A L4
06/04/2009 80% DD Progress Package, Consultant'sISD- P-atkage
https://www.justice.gov/epstein/files/DataSet%209/EFTA00259369.pdf
EFTA00605666Set 9
2014-05-079p537w
JAMES
THE UNITED STATES VIRGIN ISLANDS
LIBRARY/STUDY EXPANSION
Prepared by: Jaredian Design Group
JDG
SCHEMATIC DESIGN SUBMITTAL FOR REVIEW
May 7, 2014
EFTA00605666
L-SHAPED PORCH
PLEASE NOTE:
VIEW WINDOW ... Virgin Islands
JDG Jaredian Design Croup
Architects. Engineers and Planners
APR. 28, 2014 I SCHEMATIC DESIGN SUBMITTAL FOR REVIEW
EFTA00605667
L-SHAPED PORCH II
NEW SHRUBS TO
SCREEN ... Virgin Islands
JIDG Jaredian Design Group
Architects. Engineers and Planners
APR. 28, 2014 I SCHEMATIC DESIGN SUBMITTAL FOR REVIEW
EFTA00605668
L-SHAPED PORCH U
PLEASE NOTE:
CANOPY FOR POOLSIDE STRUCTURE
https://www.justice.gov/epstein/files/DataSet%209/EFTA00605666.pdf
EFTA01118505Set 9
2007-07-114p923w
9/18/09 Expenses Totals
Paid Bills
7/11/07 Design Fee 30,000.00 k 30,000.00
8/20/08 Schematic Design 50,000.00 a 50,000.00
10/24/08 Reimbursed Expenses a 799.49 799.49
1/13/09 Schematic Design ... Pool 30,000.00 a 30,000.00
5/4/09 Design Development - Pool 20,000.00 a 20.000.00
Schematic Design - Consultants 33,875.00 a 33,875.00
5/8/09 Reimbursed Expenses ... 9/2/09 Schematic Design - Consultants - Pool 34,500.00 a
Schematic Design - Consultants - ATV Garage 1,000.00 b
Schematic Design - Consultants - Existing Main Residence 5,000.00 c
Design Development - Pool
https://www.justice.gov/epstein/files/DataSet%209/EFTA01118505.pdf
EFTA01118439Set 9
2011-05-124p909w
9/18/09 Expenses Totals
Paid Bills
7/11/07 Design Fee 30,000.00 k 30,000.00
8/20/08 Schematic Design 50,000.00 a 50,000.00
10/24/08 Reimbursed Expenses a 799.49 799.49
1/13/09 Schematic Design ... 5/4/09 Design Development - Pool 20,000.00 a 20,000.00
Schematic Design - Consultants 33,875.00 a 33,875.00
5/8/09 Reimbursed Expenses a 2,782.72 2,782.72
9/2/09 Schematic Design - Consultants - Pool ... Schematic Design - Consultants - ATV Garage 1,000.00 b
Schematic Design - Consultants - Existing Main Residence 5,000.00 c
Design Development - Pool 46,000.00 a
Design Development - ATV Garage
https://www.justice.gov/epstein/files/DataSet%209/EFTA01118439.pdf
EFTA00727145Set 9
2009-09-2814p5,321w
approximate dates, to be confirmed, pending
authorization by Client to proceed with each phase):
• Schematic Design (approx 6 weeks): December 2008
• Design Development (approx 8 weeks): April 2009
• Construction Documents ... information regarding specific scope in each
portion of the project.
Phase One - Design
1. Schematic Design. Based on the approved Conceptual Design and Client's
authorization to proceed, Gensler will ... develop the Schematic Design, consisting
of:
a) Site plan;
b) Building elevations;
c) Typical building sections;
d) Floor plans;
e) Outline description of building systems included in Gensler's scope
https://www.justice.gov/epstein/files/DataSet%209/EFTA00727145.pdf
EFTA01074257Set 9
2014-02-217p636w
JAMES
THE UNITED STATES VIRGIN ISLANDS
LIBRARY/STUDY EXPANSION
Prepared by: Jaredian Design Group
JDC,
SCHEMATIC DESIGN SUBMITTAL FOR REVIEW
February 21, 2014
EFTA01074257
OPTION "I"
rirr DESIGN SUMMARY ... Virgin Islands
JIDG Jaredian Design Group
Architects. Engineers and Planners
FEB. 21, 2014 I SCHEMATIC DESIGN SUBMITTAL FOR REVIEW
EFTA01074258
OPTION "1"
EXISTING PATIO IN
EXPANDED FRONT OF LIVING
LIBRARY/OFFICE ... Little St. James, United States Virgin Islands
Jaredian Design Croup FEB. 21, 2014 I SCHEMATIC DESIGN SUBMITTAL FOR REVIEW
JDG Architects. Engineers and Planners
EFTA01074259
OPTION "2"
DESIGN SUMMARY:
THIS
https://www.justice.gov/epstein/files/DataSet%209/EFTA01074257.pdf
design director on interior design. Was responsible for all projects phases including programming,
schematic design, design development, meetings and site visits. Worked with multinational consulting team.
Project List
-271 Central ... design director on interior design. Was responsible for all projects phases including programming,
schematic design, design development, meetings and site visits. Worked with multinational consulting team.
Project List
-Fifth Avenue ... France 2008-2009(full time)
Architectural Designer
- Participated in all projects phases including programming, schematic design.
- Meetings and site visits.
- Worked with multinational consulting team.
Project List
-Hotel Fortuny-Paris
https://www.justice.gov/epstein/files/DataSet%209/EFTA00310039.pdf
EFTA00614387Set 9
2009-02-2615p1,475w
Little St. James Island Santa Monica CA 90405
Cabana, Pavilions, Pool & Screening Room
02/26/09 - Schematic Design
EFTA00614387
SCOPE OF WORK AT EXISTING BUILDINGS DRAWING INDEX DRAWING INDEX
EXISTNG MAIN HOUSE ... SCHEMATIC DESIGN
I I I ,
-- '1" - -4..„,_ Ie le I
t
-, I I
1
SITE PLAN
Id
N A00.50 YIIIS
SITE PLAN INISICI••••
EFTA00614389
KEY NOTES
C) Mid karma torasam ... rril
r SHEET NOTES
SCHEMATIC DESIGN
••••••••
lime a atm
an II 000
I
I41 01
te.na.
// DEMOLITION PLAN
be.
A01.01
DEMOLITION PLAN 4•118 Corr
a
EFTA00614390
KEY NOTES
Little
https://www.justice.gov/epstein/files/DataSet%209/EFTA00614387.pdf
EFTA01158379Set 9
2009-09-183p743w
9/18/09. Expenses otals
Paid Bills
7/11/2007'De&an Fee 343,605.55 _ - - 30;000.00
8/20/2008 Schematic Design 50,000.0.0 i --- 50,000.00
10/24/2008 Reimbursed Expenses ---- a 799.49 799.49
1/13/2009 SchematicDesign ... 5/4/2009 Design Development -13oOl. 20,000.00 a 20,000.00
Schematic Design - Consultants 33,875.00 ; a 33,875.00
5/8/2009Reimbursed Expenses a 2,782.72 2,782.72
9/2/2009 Schematic Design - Consultants - Pool ... Schematic Design :Consultants 7 ATV Garage _ 1,600700 b
Schematic Design - Consultants - Existing Main Residence 5,000.00 c
Design Development - Pool 46,000.00 a
Design Development -ATV Garage
https://www.justice.gov/epstein/files/DataSet%209/EFTA01158379.pdf
EFTA00603090Set 9
2009-09-183p743w
9/18/09. Expenses otals
Paid Bills
7/11/2007'De&an Fee 343,605.55 _ - - 30;000.00
8/20/2008 Schematic Design 50,000.0.0 i --- 50,000.00
10/24/2008 Reimbursed Expenses ---- a 799.49 799.49
1/13/2009 SchematicDesign ... 5/4/2009 Design Development -13oOl. 20,000.00 a 20,000.00
Schematic Design - Consultants 33,875.00 ; a 33,875.00
5/8/2009Reimbursed Expenses a 2,782.72 2,782.72
9/2/2009 Schematic Design - Consultants - Pool ... Schematic Design :Consultants 7 ATV Garage _ 1,600700 b
Schematic Design - Consultants - Existing Main Residence 5,000.00 c
Design Development - Pool 46,000.00 a
Design Development -ATV Garage
https://www.justice.gov/epstein/files/DataSet%209/EFTA00603090.pdf
EFTA00722136Set 9
2009-02-2615p1,702w
James Island Santa Monica, CA 90405
310.449.5785
Cabana, Pavilions, Pool & Screening Room
02/26/09 - Schematic Design
EFTA00722136
SCOPE OF WORK AT EXISTING BUILDINGS DRAWING INDEX DRAWING INDEX
EXISTNG MAIN HOUSE AUDIO ... DESIGNPROla ISSUE
(
Z---
9 P =
\,_
a a D F -1 rrli
r SHEET NOTES
SCHEMATIC DESIGN
INN a atm
an II 000
I
I41 01
te.na.
// DEMOLITION PLAN
be.
A01.01 ... Main batISC porch remodel
dS ase
Gensler
A
II Oa
0212420N SCHEMATICOESGSPROGRESSISSuE
SHEET NOTES
SCHEMATIC DESIGN
I-
06.7.12.0,0
FLOOR PLAN
SCREENING ROOM LEVEL
A02.00
FLOOR PLAN - GROUND LEVEL
SCALE
https://www.justice.gov/epstein/files/DataSet%209/EFTA00722136.pdf