To: jeevacation©gmail.comjjeevacation©gmail.com]; J Epsteinueeyacation©gmail.com]
Cc: Richard Kahn
From: BMG
Sent: Fri 6/8/2012 6:05:56 PM
Subject: Fwd: Zorro System design
FYI
Sent from my iPhone
Begin forwarded message:
From: Richard Boltz
Date: June 8, 2012 1:36:51 PM GMT-04:00
To:
Cc: Thr i
Subject: Zorro System design
Brice,
I should have most of what I need to complete the system overview and required items.
I still need to review this with the engineering group on the Fiber Interfaces and
Wireless VoIP delivery to make sure that we do no miss anything that will be needed to
complete the proposal. I can get a rough budgetary early next week and if the system
looks like it is acceptable then I will have to go back and detail he design for the final.
I will also get you a quote for the fiber terminations. The Fiber should be "Single Mode
Fiber" with a minimum of 4 pairs (6 Pairs will leave some expansion room) from either
Corning or OCC. I will spec the terminations when I get you a quote for the work from
the Fiber Company that we work with.
Thanks,
Richard Boltz
Project Manager
Advanced Communications and Electronics
2117 Baylor SE
Albuquerque, NM 87106
.50.5-244-3321 ext 131
EFTA_R1_00526135
EFTA02020654